__38146.original.png)
Hornby OO Coaches
-
Hornby OO Gauge GNER Mk3 Trailer Standard (TS) ‘42340’ – Era 9 R40435C
Hornby
د.إ210.19To allow locomotives to run at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic...د.إ210.19 -
Hornby OO Gauge GNER Mk3 Trailer Standard (TS) ‘42063’ – Era 9 R40435B
Hornby
د.إ210.19To allow locomotives to run at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic...د.إ210.19 -
Hornby OO Gauge GNER Mk3 Trailer Standard (TS) ‘42065’ – Era 9 R40435
Hornby
د.إ210.19To allow locomotives to run at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic...د.إ210.19 -
Hornby OO Gauge GNER Mk3 Trailer Guard Standard (TGS) ‘44045’ – Era 9 R40433
Hornby
د.إ210.19To allow running at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on...د.إ210.19 -
Hornby OO Gauge GNER Mk3 Trailer First Disabled (TFD) ‘41043’ – Era 9 R40432
Hornby
د.إ210.19To allow running at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the...د.إ210.19 -
Hornby OO Gauge GNER Mk3 Trailer First (TF) ‘41044’ – Era 9 R40431
Hornby
د.إ210.19To allow running at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the...د.إ210.19 -
Out of Stock
Hornby OO Gauge BR, Mk3 Trailer Standard Open, 42283 - Era 7 R40391
Hornby
MSRP: د.إ220.17د.إ210.19MSRP: د.إ220.17د.إ210.19 -
On SaleNow: د.إ371.68Was: د.إ415.73
-
On SaleNow: د.إ195.70Was: د.إ212.83
-
On SaleNow: د.إ183.52Was: د.إ212.83
-
On Sale
Hornby OO Gauge Transport for Wales, Mk4 DVT 82229 Era 11 R40190
Hornby
Now: د.إ391.46Was: د.إ415.73Now: د.إ391.46Was: د.إ415.73 -
On SaleNow: د.إ391.46Was: د.إ415.73
-
On SaleNow: د.إ391.46Was: د.إ415.73
-
On Sale
Hornby OO Gauge Coach Packs BR, Class 370 Advanced Passenger Train 2-car TRBS Coach Pack, 48403 + 48404 - Era 7 R40012
Hornby
Now: د.إ440.20Was: د.إ533.18This coach pack includes the two TRBS coaches required in part to complete R3873 5-car Pack (Sets 370 003 and 370 004). Colour and contents of products may vary from those illustrated yTechnical Specification & Detail ...Now: د.إ440.20Was: د.إ533.18 -
On Sale
Hornby OO Gauge Coaches BR, InterCity APT-U Ex-TS Development Vehicle, Sc48204/977527 - Era 7 R4970
Hornby
Now: د.إ188.41Was: د.إ268.91In mid-1984, TS Sc48204 was withdrawn from Set 370 004 and was sent to the Engineering Development Unit (EDU) at Derby RTC for conversion to an APT-U test vehicle, with extensive rebuilding of the underframe being undertaken in order to incorporate...Now: د.إ188.41Was: د.إ268.91 -
Hornby 00 Gauge SR, Bulleid 59' Corridor Brake Third, 2845 - Era 3 R4884
Hornby
د.إ286.24Technical Specification & Detail Length 243mm Period Era 3 (1923 - 1947) ...د.إ286.24